-
COMMERCIAL
-
RESIDENTIAL
Current Power Rates (Winter)
-
General Power Rates
Schedule Demand GSA-1 Less than or equal to 50 kW GSA-2 Greater than 50 kW and less than or equal to 1,000 kW GSA-3 Greater than 1,000 kW and less than or equal to 5,000 kW LGS-1 Greater than 5,000 kW and less than or equal to 15,000 kW LGS-2 Greater than 15,000 kW and less than or equal to 25,000 kW LGS-3 Greater than 25,000 kW -
Large Manufacturing Rates
-
Time-of-Day Rates
-
Optional Commercial Rates
-
Outdoor Lighting Rates
-
Demand Charges
COVID-19 Relief Credit
The October 2020 reduction in GSA-1, GSA-2 AND GSA-3 energy rates in relation to a decrease in TVA’s wholesale rates for pandemic relief concluded on September 30, 2023.
Small Manufacturing Credit
This credit is available for GSA-3 customers whose SIC codes are 2000 through 3999. The credit is applied as $.01076 per kWh, $1.38 per kW for the first 1,000 kW of metered demand, and $1.63 per kW for additional kW of metered demand above 1,000 kW.
Tax Exemption Status
Non-profit customers, and manufacturing customers that have a reduced tax rate, must present a certificate of exemption for each separate location they operate. A campus with buildings spanning multiple streets is considered one location. You may submit a copy of your tax exemption certificate via email to salestax@nespower.com, by fax to 615-732-6774, or by mail to: Nashville Electric Service, Rates Billing & Collections – Room 422, 1214 Church St, Nashville, TN 37246.
-
Historical Rates